What does an HDB renovation usually include?
The scope depends on the flat and its existing condition. It can include space planning, hacking and masonry, flooring, electrical and plumbing work, painting, kitchen and bathroom work, custom carpentry, installation and final defect checks. The quotation should state exactly which works and specifications are included.
Do HDB renovation works require permits?
Some works require HDB approval or must follow specific HDB conditions, including certain hacking, bathroom, plumbing, window and electrical works. The required submissions depend on the proposed scope. Confirm the approved works before site activity begins and use appropriately registered contractors where required.
How long does an HDB renovation take?
The programme depends on design approvals, permit requirements, flat condition, site-work complexity, material lead times and custom carpentry. A lighter BTO scope can be shorter than a resale renovation involving extensive hacking, rectification, rewiring or plumbing replacement. Your schedule should include design, selection, fabrication, installation and final checks.
What affects HDB renovation cost in Singapore?
The main factors are flat size, existing condition, hacking and masonry, kitchen and bathroom scope, electrical and plumbing requirements, flooring, custom carpentry quantity, material specifications and access constraints. Compare itemised quotations by scope and specification rather than looking only at the final total.
Is renovating a resale HDB different from a BTO flat?
Yes. A BTO renovation commonly starts from a newer base and may focus more on planning, carpentry, lighting and finishes. A resale flat may need existing-condition checks, removal works, waterproofing, rewiring, plumbing or surface rectification before the new interior is installed.
When should I start planning my HDB renovation?
Start by defining household needs, priorities and budget before collecting quotations. Once site access is available, confirm measurements and existing conditions before finalising drawings, specifications and the work programme. Early planning gives more time for decisions and material lead times.