The Renovation Encyclopedia

Every trade that goes into a Singapore home, from the first hack to the final handover: what it involves, the rules that apply and what good work looks like.

Browse the TradesTalk to a Designer

Why This Exists

A Renovation Is 15 Trades Working as One

Most homeowners only see the finished room. Behind it are hackers, masons, waterproofers, tilers, electricians, plumbers, ceiling installers, carpenters, painters and more, each depending on the one before.

Carpenters 匠 Interior Design Singapore has coordinated these trades for 17 years. This encyclopedia shares what we look for in each one, so you can ask better questions, whoever you renovate with.

Index

Choose a Trade

00

Permits, Rules & Site Protection

准证与保护

01

Hacking & Demolition

拆除

02

Masonry, Screeding & Plastering

泥水

03

Waterproofing

防水

04

Tiling

铺砖

05

Vinyl, Timber & Other Flooring

地板

06

Electrical Works & Lighting

电工

07

Plumbing & Gas

水管与煤气

08

False Ceilings & Partitions

天花与隔墙

09

Carpentry

木工

10

Countertops & Surfaces

台面

11

Doors & Main Entrance

门

12

Windows, Glass & Aluminium

窗与玻璃

13

Air-Conditioning

冷气

14

Painting & Wall Finishes

油漆

15

Cleaning, Defects & Handover

清洁与交屋

ENTRY 00

Permits, Rules & Site Protection

准证与保护

Every renovation starts before the first hammer swing. In Singapore, what you are allowed to change depends on whether you live in an HDB flat, a condominium or a landed home, and the paperwork has to match the work on site.

HDB Renovation →Our Credentials →

What it covers

  • HDB renovation permits for works such as hacking walls, replacing bathroom floor finishes and changing the main entrance door

  • Condominium (MCST) renovation applications, deposits and building by-laws

  • Notices to neighbours and the renovation notice outside the unit

  • Floor, lift and corridor protection before materials arrive

What good work looks like

  • Approved scope matches the drawings and the quotation, line for line

  • Protection laid on floors, doors and fixed fittings that are staying

  • Neighbours notified before noisy works begin

  • Debris removed by the contractor, never left in common areas or refuse chutes

Singapore rules to know

  • HDB restricts noisy works such as hacking, drilling and tile cutting to 9am–5pm on weekdays. No noisy works on Sundays or public holidays.
  • HDB flat owners should engage contractors from HDB's Directory of Renovation Contractors (DRC).
  • Reinforced-concrete structure in an HDB flat must not be tampered with.

Ask your contractor

Which items in my scope need an HDB or MCST permit, and who applies?
When will the noisy works happen, and how will neighbours be informed?
How will common areas and lifts be protected?
Back to index

ENTRY 01

Hacking & Demolition

拆除

Hacking is the removal of walls, tiles, kitchens and built-ins so the new layout can go in. It is the loudest and least reversible stage, so it has to be planned against the structure, not guessed.

What it covers

  • Removing non-structural partition walls (brick, hollow block, drywall)

  • Hacking existing floor and wall tiles down to the screed

  • Removing old kitchens, wardrobes, false ceilings and fittings

  • Debris bagging, carting and disposal

What good work looks like

  • Structural and non-structural walls identified on the floor plan before work starts

  • Walls taken down from the top down, in controlled sections

  • Work stops immediately if steel reinforcement is exposed

  • Concealed pipes and wiring located and isolated before hacking near them

Singapore rules to know

  • In HDB flats, hacking non-load-bearing walls needs a permit, and demolition must stop if steel bars are found.
  • Demolishing any reinforced-concrete element requires a permit and Professional Engineer supervision.
  • Household shelters must not be hacked, altered or drilled into.

Ask your contractor

Is this wall structural, and how do you know?
What happens to the floor next to the wall once it is removed?
Where does the debris go, and is disposal included?

ENTRY 02

Masonry, Screeding & Plastering

泥水

Masonry rebuilds what hacking takes away: new walls, bathroom kerbs, levelled floors and smooth plaster. Floors and walls that are flat and true here make every later trade look better.

What it covers

  • Building new brick or block walls and bathroom kerbs

  • Cement-sand screed to level floors and set falls toward drains

  • Plastering and skim-coating walls for paint

  • Patching around new pipes, sockets and door frames

What good work looks like

  • Floor falls set so water runs to the floor trap, not the door

  • New walls bonded and tied into existing structure

  • Screed allowed to cure before waterproofing or tiling

  • Walls checked with a straight edge before paint or tiles

Singapore rules to know

  • For HDB bathrooms, the total thickness of finishes and screed must not exceed 50mm.

Ask your contractor

How will you set the floor falls in the bathroom?
How long will the screed cure before the next trade starts?

ENTRY 03

Waterproofing

防水

Waterproofing is the layer you never see and the one that matters most. A failed membrane in a bathroom means leaks into the unit below, so it is done before a single tile is laid.

What it covers

  • Waterproofing membrane on bathroom floors and up the walls

  • Treatment around floor traps, pipes and sanitary stacks

  • Kitchen, balcony and planter waterproofing where required

  • Water-ponding test before tiling

What good work looks like

  • Membrane turned up the walls, kerbs and pipes, not stopped at the floor edge

  • Extra reinforcement at corners, joints and pipe penetrations

  • A water-ponding test held before tiles cover the membrane

  • Membrane protected from damage by later trades

Singapore rules to know

  • When HDB bathroom floor finishes are replaced, pre-packed waterproofing screed and a waterproofing membrane are required, upturned at least 150mm against walls, kerbs and pipes.
  • In new HDB flats, bathroom floor finishes cannot be replaced within the first 3 years from the block's completion.
  • For HDB kitchens and balconies, a membrane with a 150mm upturn is required around sanitary stacks within a 400mm radius.

Ask your contractor

Which membrane are you using, and how high does it go up the wall?
When is the ponding test, and can I see it?

ENTRY 04

Tiling

铺砖

Tiling is where precision shows. Even lines, tight joints and no hollow spots are the difference between a floor that lasts and one that cracks or rings hollow when you tap it.

What it covers

  • Floor and wall tiling for living areas, kitchens and bathrooms

  • Overlaying new tiles on existing tiles where allowed

  • Large-format porcelain, homogeneous, ceramic and mosaic tiles

  • Skirting, tile trims and grouting

What good work looks like

  • Tile layout planned from the room centre or main sightline so cut tiles sit at the edges

  • Full adhesive coverage so tiles do not sound hollow when tapped

  • Consistent joint widths and lippage within tolerance

  • Movement joints at perimeters and large spans

  • Slip-resistant tiles in bathrooms and wet areas

Singapore rules to know

  • In HDB flats, overlaid floor finishes, including adhesive, must not exceed 13mm, and only one existing layer may be overlaid.

Ask your contractor

Will you hack or overlay, and why?
Where will the cut tiles fall?
What grout are you using in the shower area?

ENTRY 05

Vinyl, Timber & Other Flooring

地板

Not every floor is tiled. Vinyl, engineered timber and other floating floors install faster and with less noise, but they need a flat base and the right product for the room.

What it covers

  • SPC and vinyl plank flooring

  • Engineered and solid timber flooring

  • Flooring overlays on existing tiles

  • Skirting and threshold transitions between materials

What good work looks like

  • Subfloor checked for level before installation

  • Expansion gaps left at walls and hidden under skirting

  • Water-resistant products chosen for kitchens

  • Flush thresholds where floor materials change

Ask your contractor

Is this product suitable for a kitchen or wet area?
How will the doors clear the new floor height?

ENTRY 06

Electrical Works & Lighting

电工

Sockets, switches and lighting have to be decided before carpentry and ceilings close them in. Getting the electrical plan right is what makes a home feel convenient years later.

What it covers

  • New and relocated power points, switches and data points

  • Lighting points, cove lighting and track lights

  • Distribution board upgrades and circuit breakers

  • Rewiring older flats

What good work looks like

  • Electrical layout drawn and approved alongside the carpentry drawings

  • Sockets placed for real furniture and appliance positions

  • Separate circuits for heavy loads such as ovens and water heaters

  • Wiring tested and the distribution board labelled at handover

Singapore rules to know

  • All wiring installation work must be carried out by a Licensed Electrical Worker (LEW) licensed by the Energy Market Authority.
  • In HDB flats, wiring must not be embedded in reinforced-concrete slabs, beams, columns or walls; it can run in trunking, conduit or false ceilings.
  • New HDB wiring or extensions must be tested by SP Services through your LEW using the HDB-endorsed form.

Ask your contractor

Who is the LEW for this job?
Where will the wiring run if the wall is concrete?
Will the distribution board need upgrading?

ENTRY 07

Plumbing & Gas

水管与煤气

Plumbing covers everything that carries water in or out: pipes, heaters, sinks and toilets. Most of it ends up hidden behind tiles and cabinets, so it has to be right the first time.

What it covers

  • Water supply pipe replacement and relocation

  • Storage and instant water heaters

  • Sinks, basins, toilets, taps and shower sets

  • Gas pipe works for hobs

What good work looks like

  • Pipes pressure-tested before they are covered

  • Isolation valves fitted so one fixture can be repaired without shutting the whole home

  • Access panels left at traps and valves that need maintenance

  • Pipe positions recorded with photos before tiling

Singapore rules to know

  • Installing or replacing water service pipes and electric storage water heaters must be done by a PUB Licensed Plumber.
  • Gas works must be done by a licensed gas service worker.

Ask your contractor

Is your plumber PUB licensed?
Will the pipes be pressure-tested before tiling?
Where will the access panels be?

ENTRY 08

False Ceilings & Partitions

天花与隔墙

A false ceiling hides pipes, wiring and air-con trunking while creating space for concealed lighting. Drywall partitions divide rooms without the weight and mess of brick.

What it covers

  • Flat, stepped and box-up false ceilings

  • L-box ceilings to conceal air-con trunking

  • Cove lighting troughs

  • Drywall partitions and acoustic infill

What good work looks like

  • Frames fixed level and braced so ceilings do not sag or crack at joints

  • Moisture-resistant boards in bathrooms and kitchens

  • Access panels below air-con units, valves and junctions

  • Board joints taped and skimmed so they disappear under paint

Singapore rules to know

  • In HDB flats, false ceilings must leave a clear height of at least 2.4m from the finished floor, except in bathrooms.

Ask your contractor

What ceiling height will I have after the false ceiling?
Where are the access panels for the air-con?

ENTRY 09

Carpentry

木工

Carpentry is the part of a renovation you touch every day: kitchen cabinets, wardrobes, shoe cabinets, TV consoles and study tables. It is designed, built off site and installed to the millimetre.

What it covers

  • Kitchen cabinets, tall units and islands

  • Wardrobes, walk-in closets and bed frames

  • Shoe cabinets, TV consoles, feature walls and display shelves

  • Study tables, vanity cabinets and commercial counters

What good work looks like

  • Final site measurements taken after masonry and tiling, before production

  • Board, finish and hardware specified in the drawings and quotation

  • Moisture-resistant materials under sinks and in bathrooms

  • Doors and drawers aligned, with even gaps, and closing smoothly at handover

  • Ventilation planned for cabinets that house appliances

Ask your contractor

What board, laminate and hardware brand are specified?
When will you take final measurements?
How is the cabinet under the sink protected from water?

ENTRY 10

Countertops & Surfaces

台面

Kitchen and vanity tops take heat, water, knives and stains every day. The right surface depends on how you cook and how much care you want to give it.

What it covers

  • Quartz, sintered stone, solid surface and natural stone tops

  • Undermount and top-mount sink cut-outs

  • Backsplashes and full-height slab walls

  • Laminate, veneer and spray-paint cabinet finishes

What good work looks like

  • Templates taken after cabinets are installed, not from drawings alone

  • Joints placed away from sinks and hobs

  • Sink and hob cut-outs reinforced and sealed

  • Edges finished and silicone lines neat and continuous

Ask your contractor

Will there be a joint, and where?
How does this surface handle heat and staining?

ENTRY 11

Doors & Main Entrance

门

The main door is the first thing guests see and a key part of your home's security. Bedroom, bathroom and kitchen doors have to fit the room's use, swing and moisture.

What it covers

  • Main entrance doors, frames and digital locks

  • Bedroom, bathroom, slide-and-swing and sliding doors

  • Metal gates

  • Door laminates, frames and architraves

What good work looks like

  • Frames installed plumb so doors do not swing open or shut on their own

  • Door undercut set for the final floor height

  • Water-resistant doors and frames for bathrooms

  • Hinges, locks and closers adjusted at handover

Singapore rules to know

  • In HDB flats, replacing the main entrance door or frame requires approval.

Ask your contractor

Does my main door replacement need a permit?
Are the bathroom doors water-resistant?

ENTRY 12

Windows, Glass & Aluminium

窗与玻璃

Windows are a safety item in high-rise Singapore, not just a design choice. Glass and aluminium also appear in shower screens, sliding doors and partitions.

What it covers

  • Window replacement and new window installation

  • Shower screens and glass partitions

  • Aluminium sliding and folding doors

  • Mirrors and glass backsplashes

What good work looks like

  • Tempered safety glass for shower screens and doors

  • Heat-soaked tempered glass to reduce the risk of spontaneous breakage

  • Window fixings and sealants checked before handover

Singapore rules to know

  • Windows must be installed by a BCA Approved Window Contractor using trained window installers.
  • When retrofitting casement windows, aluminium rivets at the stays must be replaced with stainless steel rivets.
  • A completion form must be issued to the owner after installation (Form B1 for HDB flats).

Ask your contractor

Is the window contractor BCA approved?
Is the shower screen glass tempered and heat-soaked?

ENTRY 13

Air-Conditioning

冷气

Air-con touches the electrical plan, the ceiling design and the carpentry. Routing the trunking and drain pipe early avoids exposed pipes across a finished wall.

What it covers

  • Fan-coil positions and outdoor unit placement

  • Refrigerant and drain pipe routing

  • Trunking concealed in L-box ceilings

  • Electrical isolator points

What good work looks like

  • Fan-coil positions agreed before ceiling and carpentry drawings are final

  • Drain pipes sloped so condensate flows away and does not drip

  • Service access kept clear for cleaning and repairs

Singapore rules to know

  • Air-con units in HDB flats must be installed by an installer trained by the Building and Construction Authority (BCA).

Ask your contractor

Where will the trunking and drain pipe run?
Can the units be serviced without removing carpentry?

ENTRY 14

Painting & Wall Finishes

油漆

Paint is the finish everyone notices. A clean result depends on preparation more than on the paint itself: filling, sanding, sealing and protecting everything that is not being painted.

What it covers

  • Wall and ceiling painting

  • Sealer, primer and top coats

  • Feature finishes, wallpaper and wall panels

  • Touch-up after carpentry and fittings are installed

What good work looks like

  • Cracks filled and walls sanded before sealer

  • Sealer applied before colour coats

  • Floors, carpentry and fittings masked and covered

  • Final touch-up after all other trades finish

Ask your contractor

How many coats, and is a sealer included?
Will you touch up after the carpentry goes in?

ENTRY 15

Cleaning, Defects & Handover

清洁与交屋

Handover is where the whole job is checked. Every door, drawer, tap, switch and tile is tested, defects are listed and fixed, and the home is cleaned for move-in.

What it covers

  • Post-renovation cleaning

  • Joint defect inspection with the homeowner

  • Rectification of listed defects

  • Warranty and care information

What good work looks like

  • A written defect list agreed with the homeowner

  • Every tap, switch, socket and appliance point tested

  • Doors, drawers and hinges adjusted

  • Warranty terms and care guidelines handed over in writing

Ask your contractor

How are defects recorded and closed out?
What does the warranty cover, and for how long?

Order of Works

How the Trades Fit Together

A typical sequence for a full renovation. Your scope may skip or overlap stages, but the logic stays the same: hidden work first, finishes last.

  1. 01

    Permits & protection

  2. 02

    Hacking & demolition

  3. 03

    Masonry, plumbing & wiring rough-in

  4. 04

    Waterproofing & ponding test

  5. 05

    Screeding & tiling

  6. 06

    False ceiling & partitions

  7. 07

    Sealer & first paint coat

  8. 08

    Carpentry installation

  9. 09

    Countertops, doors, windows & air-con

  10. 10

    Lighting, sanitary fittings & final paint

  11. 11

    Cleaning, defect check & handover

Glossary

Renovation Terms, Decoded

Cove lighting
Concealed LED strips set into a ceiling trough or recess so light washes the ceiling indirectly.
DRC
HDB's Directory of Renovation Contractors, a list of contractors registered to carry out renovation works in HDB flats.
Distribution board (DB)
The panel holding a home's circuit breakers. Heavier loads may need it upgraded.
E0 / E1 board
Formaldehyde emission classes for wood-based panels. E0 boards have lower emissions than E1.
Floor trap
The floor drain fitting in a bathroom or kitchen that water falls toward.
Hacking
Breaking and removing existing walls, tiles or built-ins to make way for new works.
Heat-soak test
A process that stresses tempered glass in an oven to reduce the risk of spontaneous breakage after installation.
Hollowness
A tile that sounds hollow when tapped because adhesive does not fully cover its back. It is more likely to crack or lift.
Homogeneous tile
A dense, fully vitrified tile with the same colour throughout its body, valued for strength and low water absorption.
L-box
An L-shaped false ceiling or bulkhead built to conceal air-con trunking, pipes or beams.
Laminate (HPL)
High-pressure laminate, a durable decorative sheet bonded to carpentry boards.
LEW
Licensed Electrical Worker, licensed by the Energy Market Authority to carry out electrical installation work.
Lippage
The height difference between edges of adjacent tiles. Lower lippage means a flatter floor.
MCST
Management Corporation Strata Title, the body that manages a condominium and approves renovation applications.
Overlay
Laying new tiles or flooring on top of existing tiles instead of hacking them off.
Ponding test
Flooding a waterproofed floor with water and checking for leaks before tiles are laid.
Screed
A cement-sand layer that levels a floor and sets the falls toward drains.
Sintered stone
An engineered surface made by fusing mineral particles under heat and pressure, used for countertops and walls.
Skim coat
A thin plaster or putty layer that smooths walls before painting.
SPC flooring
Stone-plastic composite vinyl flooring with a rigid core, often clicked together over existing tiles.
Upturn
The part of a waterproofing membrane that continues up the wall, kerb or pipe from the floor.

Common Questions

Renovation FAQ

What is the correct order of renovation works in Singapore?

A typical sequence is permits and protection, hacking, masonry with plumbing and wiring rough-in, waterproofing, screeding and tiling, false ceilings, first paint coat, carpentry installation, countertops, doors, windows and air-con, then lighting, fittings, final paint, cleaning and handover. The exact order depends on scope.

Which renovation works need an HDB permit?

Works such as hacking walls, replacing bathroom floor finishes and replacing the main entrance door need HDB approval. Electrical, plumbing, window and air-con works must also be done by licensed or approved workers. Your contractor should confirm permits for your specific scope before work starts.

Can I overlay tiles instead of hacking them?

Often, yes. In HDB flats, overlaid floor finishes including adhesive must not exceed 13mm, and only one existing layer may be overlaid. Overlaying is not suitable where existing tiles are hollow, cracked or uneven.

Why does waterproofing matter so much?

Bathroom leaks usually show up in the ceiling of the unit below, and fixing them means hacking finished tiles. A membrane turned up the walls and a ponding test before tiling are the best protection.

When should electrical and air-con positions be decided?

Before the carpentry and ceiling drawings are final. Once cabinets and ceilings are built, moving a socket, light or air-con trunking usually means rework.

Who carries out each trade at Carpenters 匠?

Your designer coordinates the whole project. Carpentry is produced at our own workshop. Regulated works such as electrical, plumbing, gas, windows and air-con are done by appropriately licensed or approved workers, as Singapore rules require.

Regulatory points on this page are summarised from official guidance and may change. Always confirm the current rules for your property before work starts.

HDB renovation guidelines: building worksHDB renovation guidelines: electrical worksHDB renovation guidelines: window worksBCA: window safety and approved window contractorsPUB: plumbing works and licensed plumbers